Sterilizing and Depyrogenating Tunnel – PQ Protocol

Performance Qualification (PQ) Protocol for Sterilizing and Depyrogenating Tunnel is to verify that the equipment produces the desired output. Performance qualification (PQ) of the equipment is planned after the successful…

Continue ReadingSterilizing and Depyrogenating Tunnel – PQ Protocol

Air Handling Unit (AHU) Requalification Protocol

Protocol For Qualification / Requalification of Air Handling Unit / System (AHU). This protocol describes the procedure for different tests methods, acceptance criteria, requalification criteria and documentation to be used…

Continue ReadingAir Handling Unit (AHU) Requalification Protocol

Microbiological Media Management – SOP & Guideline

Standard Operating Procedure (SOP) and Guideline for the Receipt, Storage, Preparation, Growth Promotion Test, use, and Disposal of microbiological media. Microbiological Media Guideline 1.0   Purpose: To define the procedure for…

Continue ReadingMicrobiological Media Management – SOP & Guideline